Wood report
The Public Client and the Construction Industries: the report of the Building and Civil Engineering Economic Development Committees Joint Working Party Studying Public Sector Purchasing (the Wood Report) was published in 1975.
It was the output of a working party formed in 1971, a collaboration between the government, trade unions and industry that was chaired from 1973 by Sir Kenneth Wood (following the resignation of David Morrell).
It came at the end of the post-war construction boom and the beginning of cuts in public spending, at a time when construction costs were rising sharply and the three-day week was introduced.
The Wood Report suggested:
- Lowest price tendering was damaging to the performance of the industry. This was consistent with the previous Banwell report which had found competitive tendering had a negative impact on efficiency - a finding that was largely ignored.
- There should be a rolling programme of public sector projects to stabilise demand for construction.
- Insufficient time was spent during the design and preparation stages and this led to delays, variations and additional costs during construction.
- There should be greater use of pre-approved lists of suppliers, two-stage tendering and design and build.
The report did not have a significant impact on government policy, partly due to worsening economic conditions, and partly due to the Poulson scandal which exposed local authority corruption associated with some of the forms of procurement proposed in the report.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
BSRIA Statutory Compliance Inspection Checklist
BG80/2025 now significantly updated to include requirements related to important changes in legislation.
Shortlist for the 2025 Roofscape Design Awards
Talent and innovation showcase announcement from the trussed rafter industry.
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.